The Floor Area Ratio (FAR) is a zoning metric used in urban planning to determine the density of development on a particular plot of land. It is a standard way of measuring by counting and dividing the entire building floor area.
For example, a FAR of 2.0 indicates that a building’s total floor area can be twice the size of the land area. The floor area ratio formula helps to limit building mass and bulk, which influences development scale and impact on the surrounding environment. By controlling FAR, governments try to balance development, preserve neighbourhood character, and ensure adequate light, air, and open space to make the place healthy for residents.
How do you calculate the Floor Area Ratio?
First, see through the FAR Calculation: basically, FAR is the ratio of a building’s total floor area in comparison to the size of that specific land upon which it has been built.
Collect required Information: two main pieces of information are needed:
- The first one is = Total floor area of the building
- The second one is = Total area of the land plot
Apply the Formula: The formula for FAR is:
FAR = {Total Floor Area}
———————-
{Total Land Area}
Let me give you an example calculation:
- Suppose the total floor area of the building is 80,000 square feet.
- The total land area available for the building is 10,000 square feet.
FAR = {80,000 sq ft}
–—————— = 8
{10,000sq ft}
Thus, in this case, the far area ratio will be 8.
FAR is a crucial parameter in construction, as it determines the maximum floor area on a plot on which construction can happen, and that can influence building design and development.
How does a construction company calculate the cost of building?
FAR helps a construction company in Faridabad take the first step in initiating the project. Afterwards, the company focuses on the potential cost of the whole building project and the materials required. A complete evaluation is being done by the building company to give a detailed analysis to the project owner to help him make informed decisions. Important components to calculate building cost:
- Premium material quality and quality
- Interior designing work
- Water and electricity fittings
- Labour wage and machinery expenses